CCC Ex certification agencies: NEPSI, CNEX, CQM, PCEC and others
Applicable CCC standards:
IECEx certificate/report/QAR: Acceptable
Factory inspection: Required, based on CCC requirements
Local representative: No
Certificate validity: 5 years
Sample requirement: No sample
Ex critical component requirements: IECEx or CCC approved
Document checklist: Chinese manual, technical drawings, product specification and others
Lead time: 3-4 months
Certification procedure:
Products in scope:
Other applicable regulatory requirements: SRRC, CPA and etc.
If you have any further questions, please contact us.
Applicable CCC standards:
- CNCA-C23-01:2019 - Compulsory Certification Rules - Explosion protected electrical Equipment (also called ‘CCC Ex’).
- CNCA-00C-006-2014 - Compulsory Certification Implementation Rules – General Requirements for Factory Inspection and Auditing.
IECEx certificate/report/QAR: Acceptable
Factory inspection: Required, based on CCC requirements
Local representative: No
Certificate validity: 5 years
Sample requirement: No sample
Ex critical component requirements: IECEx or CCC approved
Document checklist: Chinese manual, technical drawings, product specification and others
Lead time: 3-4 months
Certification procedure:
- Application submission
- Document review
- Factory inspection
- Draft report/certificate review
- Issue of CCC certificate
Products in scope:
- Ex motors
- Ex communication, signal devices
- Ex pumps
- Ex air conditioning, ventilation system
- Ex power distribution devices
- Ex electrical heating devices
- Ex switches, control and protective device
- Ex accessories, Ex components
- Ex starters
- Ex instruments
- Ex transformers
- Ex sensors
- Ex actuators, valves
- Safety barriers
- Ex plugs and sockets
- Ex instrument cabinets
- Ex monitoring devices
Other applicable regulatory requirements: SRRC, CPA and etc.
If you have any further questions, please contact us.